Friday, May 20, 2016

May 17 Update

Dave Mullen and Vince worked today.  Front turn signals and luggage rack on trunk installed.  Got rubber piece at bottom of windshield in position, needs to be left in place for several days to ease installation.  Straps used to hold windshield in place.  Bumpers all assembled, need to be installed.


Wednesday, May 11, 2016

May 10 work day update

Report and pictures from Ray: Al, Cam, Dave F, Dave Mullen, Donnie and Ray worked on the car today.  Progress made: top studs and side clips installed, door window rubber installed, front headlight bucket installed, painted wiper arms.  Need to order headlight adjuster screw and could really use a better headlight bucket if we find one.






Wednesday, May 4, 2016

May 3 workday

Clay Robinson, Dave Mullen and Ray Graham worked on the project car today.  We
installed tail lights, side lights, side badge, headlight (lot of drilling
out old bolts), door handles, chrome (installed last week), boot lock, fuel
filler neck and cap, back up lights, etc.  Started about 9 and worked until
3:30 with break for lunch...good day!  See pictures below: